I have a number of commercial jobs coming up. They are all new
construction. It looks like most of the jobs will have about 15
detectors, several keypads, several sirens, 7-8 access control units,
and 7-8 electric locks, and a digital video recording system (10-12
cameras).. There will also be magnetic locks on several outside doors,
that will be locally monitored. In all, there will be somewhere around
60 cable runs. Now I know that there are many ways that an installer
can keep up with his cable runs, but I would just like to know how you
would keep up with your cable runs on a simular installation, when
working alone. One other ingrediant; there will be about 3 months
between running the cables and final installation. My mind does not
remember things too well these days. Thank you.
construction. It looks like most of the jobs will have about 15
detectors, several keypads, several sirens, 7-8 access control units,
and 7-8 electric locks, and a digital video recording system (10-12
cameras).. There will also be magnetic locks on several outside doors,
that will be locally monitored. In all, there will be somewhere around
60 cable runs. Now I know that there are many ways that an installer
can keep up with his cable runs, but I would just like to know how you
would keep up with your cable runs on a simular installation, when
working alone. One other ingrediant; there will be about 3 months
between running the cables and final installation. My mind does not
remember things too well these days. Thank you.