J
Jerry Krinock
- Jan 1, 1970
- 0
As an engineer, I've loved designing and working on our photovoltaic system,
but now I need to submit my E-NET application and say which rate schedule we
want, and I keep falling asleep when reading the rate schedules and tariffs.
I hope someone could just GIVE ME THE ANSWER.
Our house is in San Jose, CA (PG&E) and use 350 KWH per month at this time.
We may get an electric car or something later, but not for a year or more.
Our system should produce quite a bit more than we use.
SIMPLE QUESTION: Which stupid rate schedule should I apply for...the
regular E1 or the time-of-use?
Jerry Krinock
San Jose, CA
but now I need to submit my E-NET application and say which rate schedule we
want, and I keep falling asleep when reading the rate schedules and tariffs.
I hope someone could just GIVE ME THE ANSWER.
Our house is in San Jose, CA (PG&E) and use 350 KWH per month at this time.
We may get an electric car or something later, but not for a year or more.
Our system should produce quite a bit more than we use.
SIMPLE QUESTION: Which stupid rate schedule should I apply for...the
regular E1 or the time-of-use?
Jerry Krinock
San Jose, CA