B
Brian Bonner
- Jan 1, 1970
- 0
I am upgrading my service panel to 150 amp. The new panel is a lot longer
than the old panel and as a result some of the hot wires will not be long
enough to reach the breaker. Am I allowed to splice within the service
panel or must I run a new line from a junction box?
than the old panel and as a result some of the hot wires will not be long
enough to reach the breaker. Am I allowed to splice within the service
panel or must I run a new line from a junction box?